Plug-in Installation
Many stations plug into your home or office via a NEMA 14-50 (or NEMA 6-50) electrical plug. When hiring an electrician, request that they install a NEMA 14-50 (or NEMA 6-50) receptacle for the rating of your JuiceBox or other JuiceNet Device (typically a 40A or 50A circuit). Make sure the receptacle is installed close to where you plan to mount your charging station. The ground prong is furthest away from the JuiceBox. NEMA 14-50 (or NEMA 6-50) input cable length will vary depending on JuiceBox model. 

 

Hardwire Installation
If your station requires hardwired installation, ask your electrician to connect the station with a protected, NEMA-compliant junction box.

 

How do I determine if my station must be hardwired?
The details below should help you determine the necessary wiring for your station. Please consult with your electrician regarding the specific parts needed for your site, but below we’ve also included an overview of the likely materials you’ll need.

 

JuiceBox 32

Charging Station Output (continuous load rating up to)  32A (7.7 kW)
Required Circuit Breaker (must be rated to 125% of the continuous load rating) 2-Pole 40A
Example stations: Clipper Creek HCS 40, JuiceBox 32

Plug-In Installation

  • 2 pole, 40A breaker1

  • NEMA 14-50 or NEMA 6-50 receptacle (NEMA 14-50R or NEMA 6-50)

  • #8AWG copper wire with 3 conductors and a ground. If single conductor THHN wire is used, the ground may be #12AWG per NEC 250.122 calculations2

For an outdoor installation, please add the following:

  • NEMA 14-50R (or NEMA 6-50) outdoor enclosure

  • Shade for the unit (if mounted to the south side of a building) so it is not in direct sun, exceeding the 90°C mark

  • #8AWG copper wire with 3 conductors and a ground. If single conductor THHN wire is used, the ground may be #12AWG per NEC 250.122 calculations2

 

1 Recommend against GFI circuit breaker. JuiceBox performs all self-test functions and meets the GFI requirement for UL certification.

2 The neutral wire is not used, but may need to be present in the receptacle.

 

Hardwire Installation

  • 2 pole, 40A breaker1

  • #8AWG copper wire with 2 conductors and a ground. If single conductor THHN wire is used, the ground may be #12AWG per NEC 250.122 calculations2,3,4

For an outdoor installation, please add the following:

  • NEMA rated outdoor junction box with gasketed cover4

  • Shade for the unit (if mounted to the south side of a building) so it is not in direct sun, exceeding the 90°C mark

 

1 Recommend against GFI circuit breaker. JuiceBox performs all self-test functions and meets the GFI requirement for UL certification.

2 Please, only use the pre-installed, hard-wire whip on the bottom of the box for hard-wire applications. We cannot honor the warranty if any other holes are added to the unit. The hard-wire whip shall be used to connect to either a junction box or disconnecting means, only. It is not long enough and is not meant to go directly into the electrical panel. Do NOT drill any additional holes into the JuiceBox enclosure as it can cause damage to the PCB and/or electronics inside.

3 A fusible disconnect may be required within 6' of your JuiceNet device installation, please consult your local code.

4 JuiceBox only -The junction box will require a knockout size of 3/4" to accommodate the box connector for the pre-wired pigtail.

 

 

 

JuiceBox 40

Charging Station Output (continuous load rating up to) 40A (9.6 kW)
Required Circuit Breaker (must be rated to 125% of the continuous load rating) 2-Pole 50A
Example stations: JuiceBox 40, JuiceBox Pro 40

Plug In Installation

  • 2 pole, 50A breaker1

  • NEMA 14-50 (or NEMA 6-50) receptacle

  • #6AWG copper wire with 3 conductors and a ground. If single conductor THHN wire is used, the ground may be #10AWG per NEC 250.122 calculations2

For an outdoor installation, please add the following:

  • NEMA 14-50R outdoor enclosure

  • Shade for the unit (if mounted to the south side of a building) so it is not in direct sun, exceeding the 90°C mark

 

1 Recommend against GFI circuit breaker. JuiceBox performs all self-test functions and meets the GFI requirement for UL certification.

2 The neutral wire is not used but may need to be present in the receptacle.

 

 

Hardwire Installation

  • 2 pole, 50A breaker1

  • Junction box to wire into from the JuiceBox2,3,4

  • #6AWG copper wire with 2 conductors and a ground. If single conductor THHN wire is used, the ground may be #10AWG per NEC 250.122 calculations2

For an outdoor installation, please add the following:

  • A watertight/weatherproof junction box or enclosure

  • Shade for the unit ((if mounted to the south side of a building) so it is not in direct sun, exceeding the 90°C mark

 

1 Recommend against GFI circuit breaker. JuiceBox performs all self-test functions and meets the GFI requirement for UL certification.

2 Please, only use the pre-installed, hard-wire whip on the bottom of the box for hard-wire applications. We cannot honor the warranty if any other holes are added to the unit. The hard-wire whip shall be used to connect to either a junction box or disconnecting means, only. It is not long enough and is not meant to go directly into the electrical panel. Do NOT drill any additional holes into the JuiceBox enclosure as it can cause damage to the PCB and/or electronics inside.

3 A fusible disconnect may be required within 6' of your JuiceNet device installation, please consult your local code.

4 JuiceBox only - The junction box will require a knockout size of 3/4" to accommodate the box connector for the pre-wired pigtail.

 

JuiceBox 48

Charging Station Output (continuous load rating up to) 48A (11.5 kW)
Required Circuit Breaker (must be rated to 125% of the continuous load rating) 2-Pole 60A
Example stations: JuiceBox 48, JuiceBox Pro 48

 

Hardwire Installation Only

  • 2 pole, 60A breaker1

  • Junction box to wire into from the JuiceBox.2,3,4

  • #4AWG copper wire with 2 conductors and a ground. If single conductor THHN wire is used, the ground may be #8AWG per NEC 250.122 calculations

For an outdoor installation, please add the following:

  • A watertight/weatherproof junction box or enclosure

  • Shade for the unit (if mounted to the south side of a building) so it is not in direct sun, exceeding the 90°C mark

 

1 Recommend against GFI circuit breaker. JuiceBox performs all self-test functions and meets the GFI requirement for UL certification.

2 Please, only use the pre-installed hardwire whip on the bottom of the box for hardwire applications. We cannot honor the warranty if any other holes are added to the unit.

3 A fusible disconnect may be required within 6' of your JuiceNet device installation. Please consult your local code.

4 JuiceBox only - The junction box will require a knockout size of 3/4" to accommodate the box connector for the pre-wired pigtail.

 

JuiceBox Pro 75

Charging Station Output (continuous load rating up to) 75A (18 kW)
Required Circuit Breaker (must be rated to 125% of the continuous load rating) 2-Pole 100A
Example stations: JuiceBox Pro 75

Hardwire Installation ONLY

  • 2 pole, 100A breaker1

  • Junction box less than 3’ away to attach the pre-wired pigtail into.2,3,4

  • #3AWG copper THHN wire with 2 line conductors and a #8AWG ground per NEC 250.122 calculations

For an outdoor installation, please add the following:

  • A watertight/weatherproof junction box or enclosure

  • Shade for the unit (if mounted to the south side of a building) so it is not in direct sun, exceeding the 90°C mark

 

1 Recommend against GFI circuit breaker. JuiceBox performs all self-test functions.

2 Please, only use the pre-installed, hard-wire whip on the bottom of the box for hard-wire applications. We cannot honor the warranty if any other holes are added to the unit. The hard-wire whip shall be used to connect to either a junction box or disconnecting means, only. It is not long enough and is not meant to go directly into the electrical panel. Do NOT drill any additional holes into the JuiceBox enclosure as it can cause damage to the PCB and/or electronics inside.

3 A fusible disconnect may be required within 6' of your JuiceNet device installation, please consult your local code.

4 JuiceBox only - The junction box will require a knockout size of 3/4" to accommodate the box connector for the pre-wired pigtail.