Bug Fixes (February 2)

  • Instant power is calculated correctly in the Device logs for the 3 phase units.
  • Load balancing algorithm is enhanced for 3 phase units and dynamic Voltage change.
  • The charging is started at a sublocation level with the load balancing enabled.
  • Load balancing is enabled after new units are added to the location.
  • Include the charging time and total cost for the OpenPay screen.
  • It is possible to stop charging on the Dashboard (China release).